user: There is an oil rig that has set large steel casing yesterday and today 11883 feet into the earth. And now they are tripping back in at at rate, that I'm trying to determine. Let's just call it Rate of Trip In "ROTI"
It's currently 9:50pm
I have been recording the depth they are tripping it at thus far:
2700 feet at 7:45pm
5190 feet at 8:51pm
6500 feet at 9:47pm
6700 feet at 9:51pm
at this rate, what is the estimated ROTI?
and at what time should I expect them to reach the bottom at 11883 feet?
assistant: Using your points (depth increasing as they trip in):
**Data**
- 2700 ft @ 7:45 pm
- 5190 ft @ 8:51 pm
- 6500 ft @ 9:47 pm
- 6700 ft @ 9:51 pm
## Estimated ROTI (Rate Of Trip In)
### Segment rates
- **7:45 → 8:51 (66 min):** 5190−2700 = 2490 ft
**ROTI ≈ 2490/66 = 37.7 ft/min** (≈ 2260 ft/hr)
- **8:51 → 9:47 (56 min):** 6500−5190 = 1310 ft
**ROTI ≈ 1310/56 = 23.4 ft/min** (≈ 1400 ft/hr)
- **9:47 → 9:51 (4 min):** 6700−6500 = 200 ft
**ROTI ≈ 200/4 = 50 ft/min** (≈ 3000 ft/hr) *(very short window; can be noisy)*
### Best single estimate (overall average so far)
From **7:45 → 9:51 (126 min):** 6700−2700 = 4000 ft
**ROTI ≈ 4000/126 = 31.75 ft/min** (≈ **1905 ft/hr**)
So, a solid estimate is **~32 ft/min**, with recent behavior bouncing roughly **~23–50 ft/min**.
## ETA to bottom (11883 ft)
At **6700 ft @ 9:51 pm**, remaining depth = **11883 − 6700 = 5183 ft**.
- Using the **overall average (~31.75 ft/min)**:
Time remaining ≈ 5183 / 31.75 = **163.3 min** ≈ **2 hr 43 min**
**ETA ≈ 12:34 am (Feb 19)**
If it tracks closer to the **last ~hour average** (8:51→9:51 is ~25.17 ft/min), then:
- Time remaining ≈ 5183 / 25.17 = **205.9 min** ≈ **3 hr 26 min**
**ETA ≈ 1:17 am (Feb 19)**
**Practical expectation:** **~12:34 am** if the overall pace holds, or **~1:15 am** if they stay on the slower recent pace.
user: make a cool looking infographic with a big oil rig and interesting landscape with rig workers around working fast tripping the pipe back down in the hole and indicate the estimated "Rate of Trip In" with those words somewhere in the info-graphic.
user: so, then basically it's around 2000 feet per hour. I'll keep you updated when they actually reach the bottom.
assistant: Yep — based on what you logged, **~1,900–2,000 ft/hr** is a clean “working” ROTI number to think with (about **~32 ft/min**).
When you get the **bottom time + depth** (or a couple more points on the way down), send them and I’ll:
- recompute the **true average ROTI** for the whole trip-in, and
- tell you whether they sped up or slowed down in the last stretch.
user: It's currently 11:11pm CT
here are my recent logs. Give me an updated rate and estimated touchdown:
7300 feet at 10:05pm
8191 feet at 10:35pm
9046 feet at 10:56pm
9425 feet at 11:08pm
9520 feet at 11:10pm
assistant: Here’s the updated ROTI from your new logs (all times **CT**).
### Segment ROTI (between points)
- **10:05 → 10:35 (30 min):** 7300 → 8191 = **+891 ft**
**ROTI ≈ 29.7 ft/min ≈ 1,782 ft/hr**
- **10:35 → 10:56 (21 min):** 8191 → 9046 = **+855 ft**
**ROTI ≈ 40.7 ft/min ≈ 2,443 ft/hr**
- **10:56 → 11:08 (12 min):** 9046 → 9425 = **+379 ft**
**ROTI ≈ 31.6 ft/min ≈ 1,895 ft/hr**
- **11:08 → 11:10 (2 min):** 9425 → 9520 = **+95 ft**
**ROTI ≈ 47.5 ft/min ≈ 2,850 ft/hr** *(tiny window, can be “bursty”)*
### Best updated “working” ROTI
Using the longer recent window **10:05 → 11:10** (65 min):
9520 − 7300 = **2,220 ft** over **65 min**
✅ **ROTI ≈ 34.15 ft/min ≈ 2,049 ft/hr** (call it **~2,050 ft/hr**, ~2,000)
---
## Estimated touchdown time at 11,883 ft
Latest depth: **9,520 ft @ 11:10 pm**
Remaining: **11,883 − 9,520 = 2,363 ft**
- Using the **recent average (~2,049 ft/hr)**:
Time left ≈ 2,363 / 2,049 hr = **1.153 hr ≈ 69.2 min**
**ETA ≈ 12:19 am CT**
If they keep the **faster pace from 10:35 → 11:10 (~2,278 ft/hr)**:
Time left ≈ **62.2 min** → **ETA ≈ 12:12 am CT**
**Updated touchdown expectation:** **~12:12–12:21 am CT** (most likely around **~12:19 am** if the last hour holds).
Keep the next couple points coming — once you hit bottom I can give you the *true* overall ROTI for the entire trip-in.
user: It's currently 12:19am
from around 12:05am up until now, they paused Tripping in at 11410 feet.
and I hear loud banging and whooshing sounds and whipping sounds with a weird echo and cracking sounds. do you have any idea of what they are doing at this stage?
assistant: Yeah — that kind of **pause + loud mechanical “banging/echo” + whooshing + whipping** is *very* common when they’re **running back in hole** and doing one of a few routine things.
You said they stopped around **11,410 ft** (about **473 ft off bottom** if bottom is 11,883). Here are the most likely “what’s happening” scenarios at that stage:
## Most likely: they’re making a connection / handling pipe
When tripping in, they have to **stop periodically to add another stand** (or handle slips/elevators).
**Sounds you’d hear**
- **Banging / cracking / echo:** iron roughneck / tongs, stabbing the pipe, slips setting, elevators latching, pipe contacting the rotary table/rig floor
- **Whipping sounds:** spinning chain / torque lines snapping tight, hose/lines flexing as the top drive moves, pipe movement/vibration
A 10–15 minute pause can be totally normal if they’re:
- fighting alignment to stab in,
- swapping tools (elevator/slip type),
- or doing a slower connection because they’re deeper and being careful.
## Very plausible near bottom: pumping / circulating / “breaking circulation”
As they approach TD/shoe, they’ll often:
- **pump to fill the pipe**,
- **circulate/condition mud**, or
- **check pressures/flow** before going the last few hundred feet.
**Sounds you’d hear**
- **Whooshing:** pumps and fluid moving through lines, standpipe/kelly hose noise, pressure changes
- **Weird echo:** rig structure amplifies it; the whole floor can resonate when pumps are on
## Also possible: they hit a tight spot and are “working the pipe”
If the hole is a little tight, they may stop and:
- work it gently up/down,
- rotate/ream/wash,
- or circulate while easing through.
**Sounds you’d hear**
- more intermittent banging (pipe bumping), plus pumps/flow noise if they’re washing/reaming.
## If they’re *very* close to shoe/float: preparing to tag/drill out
After casing is set, a common next step is running in with a BHA to **tag the shoe/float equipment** and **drill out** c…
user: The casing has already been set before this trip in. So I'm just clarifying.
assistant: Got it — if **casing is already set**, then this trip back in is almost certainly **running in the drillpipe/workstring (likely with the BHA) to tag or work inside the casing** (or to the shoe/float), not running casing.
At ~**11,410 ft** (a few hundred feet off your ~11,883 target), a pause with **banging + whooshing + whipping/echo** usually points to one of these:
### 1) Making/breaking a connection or swapping handling gear (most common)
Even after casing is set, tripping in still requires frequent stops to:
- stab in the next stand,
- latch elevators, set slips,
- make up the connection with the iron roughneck/top drive.
**Banging/cracking/echo** = metal-on-metal: tongs/roughneck torqueing, slips setting, elevators clacking, pipe stabbing.
**Whipping** = spinning chain/lines snapping tight, hose/lines flexing as the top drive moves.
### 2) Pumps on: filling the pipe / circulating / checking flow
They may pause to:
- **fill the drillpipe** as they go deeper,
- **circulate** to confirm returns,
- or do a quick **flow/pressure check** before the last few hundred feet.
**Whooshing** is classic pumps + fluid in high-pressure lines (standpipe/kelly hose noise). The rig steel makes it sound “echo-y.”
### 3) Working a tight spot or setting down gently near the shoe
Approaching the shoe/float, crews often slow down and:
- ease through a restriction,
- rotate/reciprocate lightly,
- circulate while moving cautiously.
That can create intermittent banging plus pump noise.
### 4) If they’re about to drill out: staging the drill-out sequence
With casing already set, the “next big thing” is commonly **tagging the shoe and drilling out the float equipment/cement**. Before tagging, they may pause to get:
- pumps lined up,
- top drive torque set,
- BHA parameters confirmed.
**Quick check you can do from your logs**
If, after the pause, the depth starts moving again but more slowly and steadily, that fits “approaching/tagging shoe.” If it jumps in bigger chunks, it was …
user: This oil rig started tripping out of the hole at 9000 feet at 8:30 PM and now it is 11:30 PM and they are at 3000 feet. What time do you think they will be done tripping out of the hole at this rate? And what is the average rate that they are tripping out in feet per hour?
assistant: They’ve come out **6,000 ft** in **3 hours**:
- **Start:** 9,000 ft at **8:30 PM**
- **Now:** 3,000 ft at **11:30 PM**
## Average trip-out rate
**6,000 ft ÷ 3 hr = 2,000 ft/hr**
That is also about:
- **33.3 ft/min**
## Estimated finish time
They still have **3,000 ft** left to come out.
At **2,000 ft/hr**:
- **3,000 ÷ 2,000 = 1.5 hours**
So they should be **out of the hole around 1:00 AM** if they keep the same pace.
If you want, I can also show you how to do these trip-time estimates instantly in your head with a quick rig-floor shortcut.
user: OK, yeah show me
assistant: Here’s the fast way to do it in your head on the fly.
## Quick rig-floor shortcut
Use this:
**Rate = feet moved ÷ hours elapsed**
In your example:
- 9000 ft down to 3000 ft
- Moved = **6000 ft**
- Time = **3 hours**
So:
**6000 ÷ 3 = 2000 ft/hr**
That gives you the average **trip-out rate**.
---
## To estimate finish time
Take:
**Feet remaining ÷ rate**
They still had:
- **3000 ft remaining**
At **2000 ft/hr**:
**3000 ÷ 2000 = 1.5 hours**
So from **11:30 PM**, add **1 hour 30 min**:
✅ **Estimated done time = 1:00 AM**
---
## Super fast mental version
### 1) Find feet moved
Start depth minus current depth.
- 9000 − 3000 = **6000 ft moved**
### 2) Divide by hours
- 6000 ÷ 3 = **2000 ft/hr**
### 3) Find remaining time
- 3000 remaining
- At 2000 ft/hr, that is **1.5 hr**
### 4) Add to current time
- 11:30 + 1:30 = **1:00 AM**
---
## Handy mental benchmarks
These make rough estimates fast:
- **1000 ft/hr** = 1000 ft every hour
- **2000 ft/hr** = 1000 ft every 30 min
- **3000 ft/hr** = 1000 ft every 20 min
- **1500 ft/hr** = 1000 ft every 40 min
So at **2000 ft/hr**:
- 3000 ft left = three chunks of 1000
- each chunk = 30 min
- total = **90 min**
---
## Even quicker field trick
When the rate is near **2000 ft/hr**:
- **2000 ft = 1 hour**
- **1000 ft = 30 min**
- **500 ft = 15 min**
So if somebody says:
- “We’re at 3500 and pulling at about 2000 an hour”
You can think:
- 3000 ft = 1.5 hr
- 500 ft = 15 min
- total = **1 hr 45 min**
---
## Formula cheat sheet
**Rate (ft/hr) = feet moved ÷ hours**
**Time remaining (hr) = feet remaining ÷ ft/hr**
**ETA = current time + time remaining**
---
If you want, I can make you a tiny **mudlog-style trip sheet cheat chart** with common depths and rates so you can glance at it fast.
user: Yes, please make that cheat sheet for my new mud log academy.com website. And another chat thread you had the logo for that if you could still find that, go ahead and throw that logo in there.
assistant: I’m putting together a web-ready cheat sheet graphic. I can’t reliably pull the exact old logo asset from another thread, so I’m going to make this work by branding it clearly as **MudlogAcademy.com** and include a logo-style mark in the design.
Showing first 17 of 31 messages. View the full conversation at https://mcwai.org/ai-conversation/casing-trip-in-rate-and-eta-to-11883-feet